Home
Build
↓
Built to Suit
Design, Build & Operate
Engineering & Construction
Full EPC project delivery
Store
↓
Cold Storage
Temp-controlled warehousing
3PL Management
Full supply chain outsourcing
Portable Cold Storage
Portable Cold Storage: Overview
View all units & solutions
Reefer Containers
Portable site cold storage
Customized Reefer
Purpose-built configurations
Blast Freezers
Rapid industrial freezing
Super Store
High-volume modular rooms
Super Freezer
Ultra-low -70°C storage
ISO Tanks
Liquid cargo transport
AMC & Spare Parts
24/7 maintenance support
Dry & Modular
Tunnel Containers
Drive-through dual-door access
Open Top Containers
Open-roof for crane-loaded cargo
Hard Top Containers
Removable steel roof panels
Cold Rooms
Modular walk-in refrigeration
Dry Containers
Standard 20ft & 40ft dry boxes
Dry Fabricated
Prefab cabins & modular rooms
Accessories
Container parts & fittings
Move
↓
Transportation
Pan-India cold chain logistics
Process
↓
Fruits & Vegetables Processing
Pre-cooling, sorting & packing
Blast Freezing
Rapid industrial freezing services
Solve
↓
Custom Solutions
Bespoke cold chain design
Loading Calculator
Find the right container size
Pallet Guide — Reefer
Euro, standard & trolley counts
Pallet Guide — Blast Freezer
Blast freezer pallet configs
Pallet Guide — Super Freezer
Ultra-low temp configurations
Pallet Guide — Super Store
Modular storage pallet guide
Impact
About
Careers
Talk to us
→
Case Studies
Store
FMCG
Case Study
30
40ft Blast Freezer Deployment For Raw Chicken Processing In Telangana
Client
Vimla Feeds Pvt Ltd
Location
Medak District, Telangana
Product
40ft Five-Machine Blast Freezer (Lease)
The Brief
Challenge
Rapid blast freezing solution required for raw chicken processing
Ultra-low -35°C temperature needed for efficient product preservation
High daily processing volume of approximately 700 crates per cycle
Uninterrupted operations required across twice-daily blast freezing cycles
Fast deployment required under a lease model
Our Approach
Solution
1 unit of 40ft Five-Machine Blast Freezer supplied
System configured to achieve stable -35°C blast freezing performance
LED lighting and strip curtains integrated for efficient workflow and temperature retention
Complete PTI inspection and operational testing conducted before dispatch
Operational readiness ensured with minimal setup time at client facility
Results
Difference
Maintained consistent -35°C temperature performance during operations
Quick deployment reduced operational delays and enabled faster production readiness
Improved product quality preservation and cold chain reliability
Flexible lease model helped optimise operational investment
Smooth coordination between operations, logistics, and deployment teams ensured successful project execution
Units Deployed
1
Temperature
-35°C
Daily Volume
~700 crates/cycle
Contract Type
Lease